An
airy and porous structure that wraps the building in a vertical
alignment and fulfils various tasks at the same time holds centre stage
in the design of the building. The advantages of the openwork façade are
to be seen not only in the eye-catching visual effect of its complex,
CNC-generated parabolic pattern, but more particularly in
climate-related aspects such as solar shading and ventilation. To enable
air to circulate as freely as possible, the first floor is raised
except for a core area in which auxiliary rooms are located, plus a
chimney-like atrium leads up through the centre of the building. Double
room heights make sure that warm air is unable to accumulate in working
areas. Attention has also been paid to the reusability of materials.
After all, short-term leaseholds and urban redevelopment are the order
of the day in Singapore.
Project data
Structural engineering: HS Engineering Consultants
Building services: K L Au & Associates
General contractor: Eng Lam Contractors Co Pte Ltd
Structural engineering: HS Engineering Consultants
Building services: K L Au & Associates
General contractor: Eng Lam Contractors Co Pte Ltd